Huicicila Gold Mining
Huicicila Gold is a mining company specializing in the extraction, processing, and commercialization of gold and other precious metals. We operate strategic projects in Mexico and Africa, utilizing cutting-edge technology and ensuring secure investments through a trust backed by high-value assets. Our commitment to sustainability and operational efficiency allows us to offer high-quality products while protecting the environment and supporting the development of local communities.

Gold
A valuable, yellow metal used in jewelry, electronics, and as an investment. It’s highly conductive and resistant to corrosion.

Silver
A shiny, highly conductive metal used in jewelry, electronics, and solar panels, known for its brightness and ductility.

Silver sulfide
A black compound formed when silver reacts with sulfur. It’s a key ore of silver in mining.

lead
A dense, soft metal used in batteries, radiation shielding, and industrial applications, though its use is regulated due to toxicity.

zinc
A metal mainly used for galvanizing steel to prevent rust and in batteries, alloys, and health products.

copper
A reddish metal essential for electrical wiring, plumbing, and machinery, known for its high conductivity and corrosion resistance.

Polymetallic Sulfides
Ores containing several metals, like copper, lead, zinc, silver, and gold, combined with sulfur, extracted for their valuable metal content.
Explore our mining projects
Mine in Ameca, Jalisco
Ameca
Location: Ameca, Jalisco.
Production Capacity: 300 to 1,000 tons per day.
Ore Grade: 3 g of gold and 120 g of silver per ton.
Additional Minerals: Presence of silver, copper, and zinc sulfides.
Geology: Geological formation with gold-bearing quartz veins and low-sulfidation epithermal deposits.
Investment and Technology: Using state-of-the-art machinery, full production is expected within three months, with projected profits of $3 million per month.
Mining Method: Underground mining with cut and fill methods for efficient and safe extraction.
Sustainability: Implementation of remediation and reforestation plans, wastewater treatment programs, and impact reduction initiatives.
Metallurgical Processing: Flotation, cyanide leaching, and electrolytic refining to maximize final product purity.
Project in Sonora, Mexico
Sonora
Largest placer gold deposit in Mexico.
Location: Sonora
Processing Capacity: 2,500 tons per day with an ore grade of up to 3 g of gold per ton.
Additional Minerals: Polymetallic sulfides, with the presence of copper and lead.
Geology: Alluvial gold deposit with material accumulations transported by river currents.
Implementation Time: Between 3 and 6 months.
Expected Profits: $8 million per month.
Extraction Process: Use of screening and heap leaching to maximize mineral recovery.
mine in nayarit
El Copal
Location: Municipality of El Nayar, Nayarit, Mexico.
Production Capacity: Exploration phase with high-volume potential.
Ore Grade:
- Lead (Pb): Up to 4.77%
- Zinc (Zn): Up to 15.92%
- Silver (Ag): Up to 1,639 g/t
- Gold (Au): Up to 6.022 g/t
Additional Minerals: Copper and other polymetallic sulfides.
Geology: Intermediate-sulfidation epithermal deposits with brecciated quartz structures.
Infrastructure: Accessible from Tepic via dirt roads and ferry. Electrical grid less than 1 km from the mining concession.
Mining Method: Exploration through geological mapping, surface, and underground sampling. Drilling is recommended to determine the extent and depth of mineralization.
Sustainability: Strong relationship with local Huichol communities, with agreements in place for exploration and potential future exploitation.
Metallurgical Processing: Preliminary evaluations indicate the feasibility of flotation and leaching for metal recovery.
Beneficiation and Refining Plant in Uganda
Uganda
Location: Uganda, Africa.
Objective: Construction of a gold beneficiation and refining plant to enhance product value and strengthen the company’s global market position.
Processing Capacity: Planned to refine several tons of gold per month.
Investment and Technology: Significant investment in infrastructure and cutting-edge technology to ensure high-purity gold refining.
Implementation Timeline: Expected to be operational within 9 months.
Global Impact: The plant will diversify the company’s value chain and open new international markets, reinforcing Huicicila Gold’s presence in the precious metals industry.